Edit, pause and resume a Routine
Keep control of what repeats and when, using the existing Routine lifecycle.
Explore this guide
Inspect before changing
Open the exact Routine and review its current state, schedule, instructions and recent runs. Identify whether you want to change future execution or continue a past result. These are different actions.
Read the full sectionInspect before changing
Open the exact Routine and review its current state, schedule, instructions and recent runs. Identify whether you want to change future execution or continue a past result. These are different actions.
Manage the schedule
Use Pause when you want to stop future scheduled execution. Use Resume when the reviewed schedule should run again. Run now is a manual invocation; it does not mean the recurring cadence changed.
Use Edit to change the future configuration and follow the shown review or publication steps. When removing a Routine, read the confirmation and make sure it is the intended registration.
After a change
Reopen the Routine to confirm the saved configuration and state. If a turn is already active, inspect that run separately; changing future scheduling should not be treated as proof that an active turn was cancelled.